Parker speeds up the wash plant to process more material and increase gold production.
Tyson suggests setting up the next wash plant to optimize production and double output.
Parker speeds up the wash plant to process more material and increase gold production.
Tyson suggests setting up the next wash plant to optimize production and double output.
How is Parker trying to increase gold production?
—Parker is accelerating the wash plant operation to process more material and maximize gold production.
What is Tyson's plan?
—Tyson proposes a radical plan to set up the next wash plant for increased output and to double production.
16:31Parker accelerates wash plant operation to maximize gold production.
17:59Tyson proposes a radical plan to increase output in the next plant.