How to Lay a Concrete Pad: Step-by-Step Guide

TLDRLearn how to lay a concrete pad for your shed or driveway with this step-by-step guide. Follow along to ensure a level and sturdy base for your project.

Key insights

⭐️Proper preparation is essential when laying a concrete pad for a shed or driveway.

🔨Creating a boxing with timber is necessary to contain the concrete and maintain the desired shape.

📏Checking the squareness of the boxing is crucial for ensuring a level concrete pad.

🚧Removing soil and adding compacted basecourse and sand provide a stable foundation for the concrete pad.

Finishing touches, such as screeding and troweling, result in a smooth and professional-looking concrete pad.

Q&A

What tools and materials do I need to lay a concrete pad?

You will need timber, nails, pegs, basecourse, sand, polythene, concrete blocks, a concrete mixer, and trowels.

How deep should the concrete pad be?

The depth of the pad depends on the specific project. Refer to Mitre 10's online guide for the recommended depth.

Can I make a concrete pad level with the ground?

Yes, it is possible to have a concrete pad at ground level. However, it can also be raised above the ground if desired.

How long does the concrete take to cure?

Allow the concrete to cure for approximately 48 hours before removing the boxing.

Can I spray the concrete with water after pouring?

Yes, in sunny conditions, lightly spraying the concrete with water can help prevent cracking or shrinking.

Timestamped Summary

00:05Learn how to lay a concrete pad for your shed or driveway.

00:23Use timber to create a boxing for the concrete pad.

01:36Remove soil and prepare the area for the compacted basecourse and concrete.

03:40Follow the recommended steps for screeding and troweling the concrete.

04:07Allow the concrete to cure for approximately 48 hours.